Data quality report

Hunts Coaches_Skegness_7_20211101

1

Bus line

88%

RED
Data quality

18

Critical observations

9

Advisory observations

Contents

Critical observations (18)

These observations are considered critical in terms of data quality. An operator should aim to have zero critical observations in their data.

Timing (17)
Number of observations Observation category
9 First stop is not a timing point
8 Last stop is not a timing point
Data set (1)
Number of observations Observation category
1 Missing block number

Advisory observations (9)

These observations suggest there may be an error in the data. However, for some types of services these may be intended by the operator. Advisory observations should be investigated and addressed. If the observation is a result of intended behaviour, an operator can suppress the observation.

Timing (9)
Number of observations Observation category
9 No timing point for more than 15 minutes