Data quality report

A2B Travel Group Ltd_Cambridge_Great Shelford_20230601

9

Bus lines

9

Critical observations

76

Advisory observations

Contents

Critical observations (9)

These observations are considered critical in terms of data quality. An operator should aim to have zero critical observations in their data.

Data set (9)
Number of observations Observation category
9 Missing block number

Advisory observations (76)

These observations suggest there may be an error in the data. However, for some types of services these may be intended by the operator. Advisory observations should be investigated and addressed.

Stops (4)
Number of observations Observation category
4 Missing stops
Timing (72)
Number of observations Observation category
2 Fast running time between stops
12 First stop is not a timing point
17 Last stop is not a timing point
41 No timing point for more than 15 minutes