Data quality report

Linden Holdings (Devon) Ltd_Okehampton_Crediton_20210721

15

Bus lines

16

Critical observations

16

Advisory observations

Contents

Critical observations (16)

These observations are considered critical in terms of data quality. An operator should aim to have zero critical observations in their data.

Timing (2)
Number of observations Observation category
2 Fast timing between timing points
Data set (14)
Number of observations Observation category
14 Missing block number

Advisory observations (16)

These observations suggest there may be an error in the data. However, for some types of services these may be intended by the operator. Advisory observations should be investigated and addressed.

Stops (6)
Number of observations Observation category
6 Missing stops
Timing (10)
Number of observations Observation category
3 Fast running time between stops
7 No timing point for more than 15 minutes