This is a new service – your feedback will help us to improve it.

Data quality report

R & J Coaches_South Ashford_HS1_20201218

1

Bus line

95%

AMBER
Data quality

1

Critical observation

3

Advisory observations

Contents

Critical observations (1)

These observations are considered critical in terms of data quality. An operator should aim to have zero critical observations in their data.

Timing (1)
Number of observations Observation category
1 Fast timing between timing points

Advisory observations (3)

These observations suggest there may be an error in the data. However, for some types of services these may be intended by the operator. Advisory observations should be investigated and addressed. If the observation is a result of intended behaviour, an operator can suppress the observation.

Timing (3)
Number of observations Observation category
1 Fast running time between stops
1 Slow running time between stops
1 Slow timing between timing points