This is a new service – your feedback will help us to improve it.

Data quality report
CRITICAL ISSUES

Bullocks Coaches_Heald Green_Woodsmoor_20160301_1

1

Bus service
affected

2

Critical observations

1

Advisory observation

Contents

Critical observations (2)

These observations are considered critical in terms of data quality. An operator should aim to have zero critical observations in their data.

Timing (2)
Number of observations Observation category
1 First stop is not a timing point
1 Last stop is not a timing point

Advisory observations (1)

These observations suggest there may be an error in the data. However, for some types of services these may be intended by the operator. Advisory observations should be investigated and addressed. If the observation is a result of intended behaviour, an operator can suppress the observation.

Stop (1)
Number of observation Number of suppressed observations Observation category
1 0 Stop not found in NaPTAN