This is a new service – your feedback will help us to improve it.

Data quality report

Reliance Motor Services Limited_Clifton_Easingwold_20200615_29

21

Bus lines

90%

AMBER
Data quality

39

Critical observations

21

Advisory observations

Contents

Critical observations (39)

These observations are considered critical in terms of data quality. An operator should aim to have zero critical observations in their data.

Timing (22)
Number of observations Observation category
2 First stop is not a timing point
20 Last stop is not a timing point
Data set (17)
Number of observations Observation category
17 Missing block number

Advisory observations (21)

These observations suggest there may be an error in the data. However, for some types of services these may be intended by the operator. Advisory observations should be investigated and addressed. If the observation is a result of intended behaviour, an operator can suppress the observation.

Stop (15)
Number of observations Observation category
15 Missing stops
Timing (6)
Number of observations Observation category
3 Slow running time between stops
3 Slow timing between timing points