Data quality report

Ensign Bus_Grays_Tilbury_20210906_32

48

Bus lines

92%

AMBER
Data quality

32

Critical observations

21

Advisory observations

Contents

Critical observations (32)

These observations are considered critical in terms of data quality. An operator should aim to have zero critical observations in their data.

Data set (32)
Number of observations Observation category
32 Missing block number

Advisory observations (21)

These observations suggest there may be an error in the data. However, for some types of services these may be intended by the operator. Advisory observations should be investigated and addressed.

Stops (5)
Number of observations Observation category
5 Missing stops
Timing (3)
Number of observations Observation category
1 First stop is not a timing point
2 Last stop is not a timing point
Journey (13)
Number of observations Observation category
13 Expired lines