Data quality report

Pulhams Coaches_Cheltenham_Bishops Cleeve_20230419

22

Bus lines

99%

AMBER
Data quality

16

Critical observations

79

Advisory observations

Contents

Critical observations (16)

These observations are considered critical in terms of data quality. An operator should aim to have zero critical observations in their data.

Timing (15)
Number of observations Observation category
15 Fast timing between timing points
Data set (1)
Number of observations Observation category
1 Missing block number

Advisory observations (79)

These observations suggest there may be an error in the data. However, for some types of services these may be intended by the operator. Advisory observations should be investigated and addressed.

Stops (32)
Number of observations Observation category
32 Missing stops
Timing (47)
Number of observations Observation category
39 Fast running time between stops
8 No timing point for more than 15 minutes