Data quality report

Stagecoach_Scunthorpe_Mansfield_20211003_19

269

Bus lines

99%

AMBER
Data quality

15

Critical observations

495

Advisory observations

Contents

Critical observations (15)

These observations are considered critical in terms of data quality. An operator should aim to have zero critical observations in their data.

Stops (2)
Number of observations Observation category
1 First stop is found to be set down only
1 Incorrect stop type
Data set (13)
Number of observations Observation category
13 Missing block number

Advisory observations (495)

These observations suggest there may be an error in the data. However, for some types of services these may be intended by the operator. Advisory observations should be investigated and addressed.

Stops (264)
Number of observations Observation category
264 Missing stops
Timing (184)
Number of observations Observation category
176 No timing point for more than 15 minutes
4 Slow running time between stops
4 Slow timing between timing points
Journey (47)
Number of observations Observation category
6 Duplicate journeys
29 Expired lines
12 Journey overlap