This is a new service – your feedback will help us to improve it.

Data quality report

Go-Ahead_Colchester_Norwich_20180701_39

351

Bus lines

91%

AMBER
Data quality

299

Critical observations

218

Advisory observations

Contents

Critical observations (299)

These observations are considered critical in terms of data quality. An operator should aim to have zero critical observations in their data.

Timing (43)
Number of observations Observation category
4 Fast timing between timing points
9 First stop is not a timing point
30 Last stop is not a timing point
Data set (256)
Number of observations Observation category
256 Missing block number

Advisory observations (218)

These observations suggest there may be an error in the data. However, for some types of services these may be intended by the operator. Advisory observations should be investigated and addressed. If the observation is a result of intended behaviour, an operator can suppress the observation.

Stop (163)
Number of observations Observation category
160 Missing stops
3 Stop(s) are not found in NaPTAN
Timing (25)
Number of observations Observation category
2 Fast running time between stops
23 No timing point for more than 15 minutes
Journey (30)
Number of observations Observation category
20 Expired lines
10 Journey overlap